A Pre-Start Health and Safety Review (PSR) depends on information. The engineer conducting it needs to understand how the equipment is guarded, how its safety functions work, and how it will be installed. Much of that information comes from the OEM.

Missing or incomplete OEM documents commonly cause PSR delays. This blog focuses on what the OEM should deliver. If you are still deciding whether your purchase needs a PSR, start with Does New Equipment Bought to a Purchase Specification Still Need a PSR?

People Also Ask

Can a PSR be completed without OEM drawings?

It can be difficult. Without drawings and schematics, the engineer may need to gather information on site, which takes longer and can increase the number of findings.

Are electronic PSR records acceptable in Ontario?

Yes. Ontario guidance accepts electronic records if they are accessible for future use and meet the same requirements as written reports, including signatures and seals.

Does the joint health and safety committee receive the PSR report?

Yes. Where a PSR is required, provide a copy of the written report to the joint health and safety committee or health and safety representative, if any.

Why OEM Documents Matter to the PSR Engineer

Under Section 7 of O. Reg. 851, the PSR report must set out the measures needed to comply with the applicable provisions. It must also list the standards, specifications, calculations, and risk analyses used to prepare it. The engineer cannot do this from a visual inspection alone.

Clear PSR documentation requirements let the engineer review the design rather than reverse engineer it. When drawings and schematics arrive late or incomplete, the review slows down and findings increase.

The reviewer also needs to know which documents describe the final design. Drawings marked with revision numbers and dates make it clear which version was reviewed. If the OEM issues a revision after the review, flag the change so the engineer can assess whether it affects the findings.

General Arrangement and Guarding Drawings

General arrangement drawings show the overall layout, footprint, and access points. Guarding drawings show how each hazard zone is protected. Together, they let the engineer assess guard placement, openings, and distances to hazards.

Useful drawings show dimensions, guard materials and fastening, interlocked guard locations, and the positions of presence sensing devices. They should reflect the machine as built, not an early concept.

Electrical Schematics and Safety Circuit Documentation

Electrical schematics show how the equipment is powered and controlled. Safety circuit documentation shows how emergency stops, interlocks, and safeguarding devices connect to the control system and stop hazardous motion.

The engineer will review the safety relay or safety controller configuration, device wiring, reset logic, and measures that prevent unexpected startup. Where safety functions are designed to a performance level, the OEM should provide the supporting calculations or validation records.

OEM Risk Assessment and Hazard Analysis

A documented risk assessment shows which hazards the OEM identified and how it addressed them. It should cover operation, setup, cleaning, maintenance, and jam clearing.

The assessment gives the PSR engineer a starting point. It does not replace the engineer’s own review. Gaps between the risk assessment and the delivered equipment often drive findings, so the OEM should update the assessment when the design changes.

Component Ratings and Certification Records

Safety components must suit their application. The OEM should provide data sheets and ratings for safety relays, interlock switches, light curtains, safety mats, and similar devices.

Certification records matter as well. These include evidence of electrical approval for use in Ontario and any manufacturer declarations stating the standards used. Where a PSR exemption for machine safeguarding may be considered, the guideline expects documents showing the equipment meets current applicable standards. Together, these records form the machine safety documentation Ontario reviewers rely on.

Operating, Maintenance, and Lockout Information

Operating and maintenance manuals show how people will interact with the equipment. They help the engineer understand which tasks require access to hazard zones and how often.

Lockout information is especially important. The OEM should identify every energy source, its isolation point, and how stored energy is released or blocked. This information supports the facility’s lockout procedures and the engineer’s review of maintenance access.

Documentation for Lifting Devices, Racking, and Dust Collection Systems

Some equipment triggers Section 7 for reasons other than machine guarding. Each needs its own documents:

  • Lifting devices. For cranes, hoists, and similar devices, the PSR report must address structural adequacy. Load ratings, design data, and information on the supporting structure are needed. Where the supporting structure was originally designed for the device, records showing this may support an exemption.
  • Racking. For racks and stacking structures, load capacities, design information, and evidence of design and testing to current applicable standards are needed. That evidence may also support the exemption available under the Table.
  • Dust collection systems. Where a dust collector involves a risk of ignition or explosion, the engineer needs information on the dust being collected, the collector design, and the explosion protection measures. No exemption is listed for this item.

Collecting OEM documentation for PHSR purposes on these systems early avoids gaps that are hard to fill once equipment is on site.

Making Documentation a Contractual Deliverable in the Purchase Specification

OEMs supply what the contract requires. If documentation is not listed, it may arrive late, incomplete, or not at all. For guidance on how to build these requirements into the contract from the start, see Purchasing Specification Approach: Building Safety Compliance Into Equipment Before the Purchase Order.

A purchase specification can list each required document, its format and language, and a submittal date tied to a project milestone. It can also link final payment or a holdback to delivery of a complete documentation package. See Requirements to Include in a Machine Safety Purchase Specification for the full list of clauses and our guide to the Purchasing Specification Approach for the complete process.

The finished package also has a long life. Keep the PSR report and supporting documents readily accessible in the workplace for as long as the equipment remains there. A copy of the report must also be provided to the joint health and safety committee or health and safety representative, if any.

Conclusion

The PSR engineer can only review what the OEM provides. Clear PSR documentation requirements in the purchase specification help documents arrive on time and in the detail the review needs. That supports a smoother review and fewer surprises at startup.

If you are planning a new equipment purchase, contact SAFE Engineering Inc. to discuss which OEM documents your project will need. Learn more about our Pre-Start Health and Safety Review services.